Tel:
China Wind Turbine Generator System manufacturer
Guangzhou HY Energy Technology Limited Corp.

HY Energy-Engineer To Build A Cleaner World

Home ProductsOff Grid Wind Turbine

Three Phase Off Grid Wind Turbine With Guyed Tower Digging Pole Energy Supply

Three Phase Off Grid Wind Turbine With Guyed Tower Digging Pole Energy Supply

Three Phase Off Grid Wind Turbine With Guyed Tower Digging Pole Energy Supply

Product Details:

Place of Origin: China
Brand Name: HYE
Certification: CE,UL, ISO9001
Model Number: HY--600

Payment & Shipping Terms:

Minimum Order Quantity: 1
Price: Negotiable
Packaging Details: standard export packing
Delivery Time: 3-5 working days
Payment Terms: L/C, D/A, D/P, T/T, Western Union
Supply Ability: 3000pcs/month
Contact Now
Detailed Product Description
Type: Low Wind Start No.of The Blade: 5
Color: White Start Up Wind Speed: 2m/s
Cut In Wind Speed: 2.5m/s Noise Level: <30dB
Over-speed Controller: Electromagnetic & Blade Aerodynamic Braking Material: Nylon

Three Phase AC Stainless Steel Rotor Off Grid Wind Turbine With Guyed Tower Digging Pole Energy Supply​
 
 

 

Description For Off Grid System Use:

 

Wind Power Off Grid System is a stand alone power system. The energy produced by the wind turbine through the charge controller to make the 3 phase AC into DC, then store the power into the battery bank. A inverter which connected into the battery bank change the DC power into the AC power then transmit the electricity to the house equipments .

 

Wind Off Grid Power System Include:

 

  1.  Smart Small Wind Turbine
  2.  Hybrid MPPT Controller
  3.  Energy Storage --- maintenance free AGM gel deep cycled battery
  4.  Inverter
  5.  6M/9M Guyed Tower

 

Wind Generator Technical Parameters

 

400W-1000W

Rated Output 400W 600W 1000W
Peak Output 500W 750W 1200W
Rated Voltage(V) DC24 DC24 DC24
Start-up Speed 2m/s or 4.5mph 2m/s or 4.5mph 2.5m/s or 5.6mph
Cut-in Speed 2.5m/s or 5.6mph 2.5m/s or 5.6mph 3m/s or 6.7mph
Rated Wind speed(m/s) 12m/s or 26.8 mph 12m/s or 26.8 mph 12m/s or 26.8 mph
System average Cp. ≥0.36 ≥0.36 ≥0.36
Rotor Diameter(m) 1.55M 1.75M 1.96M
Carton NW/GW (KG) 22/25KG 25/28KG 28/32KG
Carton Measurement 118 X 46 X 26CM 125 X 52 X 26CM 147 X 52 X 26CM

 

1500W-3000W

Rated Output 1500W 3000W
Peak Output 1800w 3500W
Rated Voltage(V) off-grid DC48 off-grid DC48
Start-up Speed 2m/s or 4.5mph 2m/s or 4.5mph
Cut-in Speed 2.5m/s or 5.6mph 2.5m/s or 5.6mph
Rated Wind speed(m/s) 12m/s or 26.8 mph 12m/s or 26.8 mph
System average Cp. 0.38 ≥0.36
Over-speed Control Electromagnetic & blade aerodynamic braking Electromagnetic & blade aerodynamic braking
Rotor Diameter(m) 2.05m 3.05m
Blade Material reinforced nylon glass-fiber reinforced nylon glass-fiber
Generator Type 3-phase with permanent Neodymium Magnet 3-phase with permanent Neodymium Magnet
Carton NW/GW (KG) 36/43KG 70/84KG
Carton Measurement 112X 70X 30CM 197 X 76.5 X 34CM

 

Installation Guyed Tower Advise:

 

Wind Turbine HY400/600/1000/1500 HY2000/3000
Tower Height(m) 6 9 6 9
Pole Diameter(mm) φ76 φ114
Thickness(mm) 3.5 4.0
Length and Quantity of each rod 3m(total 2 sections) 3m total 3 sections) 3m(total 2 sections) 3m(total 3 sections)
Wire rope Diameter(mm) φ10.0 φ12.0
Basic Types Concrete /angle steel anchor foundation
(HY1500 has concrete foundation only)
Concrete foundation

Remark: if tower need to be moved frequently or foundation soil is cement, you can fix the guyed tower with nail and angle steel anchor structure according to requirement, no need concrete pouring (for HY400/600/1000 wind turbine only).

 

F&A

 

Q1:Can you provide complete power system or only wind turbine?

Yes, we can supply not only the wind turbine but also all the parts of the system

 

Q2:Can you design the power system ?

Yes, we have worked in wind power field for over 16years, we can give you professorial technical advice and according to your request to design the power system for you.

 

Q3: Is our wind big enough for it?

HYE wind turbine starts up at 2m/s. For the area whose average yearly wind speed over 2m/s, you can use it.

 

Q4: I dont know the wind speed of my area?

Send us email, we can help you to check.

 

Q5: Delivery time?

Sample order for 10 days; Bulk order for 25days

 

Q6:How about the shipping?

Our Packing of the wind turbine usually in one carton, it can be ship by express or by sea.

 

 

 

 

Contact Details
Guangzhou HY Energy Technology Limited Corp.

Contact Person: Tina Tang

Send your inquiry directly to us (0 / 3000)

Guangzhou HY Energy Technology Limited Corp.
5th &7th Floor,Tiangui Building B Tower,No.62 Tiangui Road,Huadu District,Guangzhou,China
Tel:86-20-36888000-8010
Mobile Site Privacy Policy China Good Quality Wind Turbine Generator System Supplier. Copyright © 2017 - 2020 windturbinegeneratorsystem.com. All Rights Reserved. Developed by ECER