Tel:
China Wind Turbine Generator System manufacturer
Guangzhou HY Energy Technology Limited Corp.

HY Energy-Engineer To Build A Cleaner World

Home ProductsHorizontal Wind Turbine

1.5KW Horizontal Wind Turbine Rooftop Mounting With 3 Phase AC Permanent Magnet

1.5KW Horizontal Wind Turbine Rooftop Mounting With 3 Phase AC Permanent Magnet

1.5KW Horizontal Wind Turbine Rooftop Mounting With 3 Phase AC Permanent Magnet

Product Details:

Place of Origin: China
Brand Name: HYE
Certification: ISO9001:2008, CE, RoHS, ETL
Model Number: HY-1500

Payment & Shipping Terms:

Minimum Order Quantity: 1 pc
Price: Negotiable
Packaging Details: NW/GW: 68/76KG Dimensions: 177 x 76.5 x 34CM Packing material: poly foam & Cardboard Box carton.
Delivery Time: 12-15 days for bulk order
Payment Terms: T/T, L/C, Western Union, MoneyGram
Supply Ability: 3000pcs/month
Contact Now
Detailed Product Description
Rated Output: 1500W Start-up Speed: 2m/s Or 4.5mph
Rated Rotor Speed (RPM): 700 Rated Wind Speed: 12 M/s Or 26.8 Mph
Survival Max. Wind: 60 M/s Or 133mph Number Of Blades: 5
Blade Material: Reinforced Nylon Glass-fiber Net Weight: 35 KG
Tower Connection: Flange Connection Or Bolt-on Clamp Warranty: 5 Years

1.5KW Horizontal Wind Turbine Rooftop Mounting Of 3Phase AC permanent magnet

 

 

1. Introduction

 

With over 16 years experience in production and application of wind & solar hybrid power system, HY Energy has developed over 20 different application fields of wind and wind solar hybrid system such as residential grid-tie power system, residential off-grid power system, stand-alone wind solar hybrid street lighting, wind solar hybrid powered telecom tower, wind solar hybrid powered monitoring system etc.

 

Most of these applications have been widely applied around the world and enjoyed a good reputation by its system quality, reliability and professional pre-sales and after-sales service of HYE team. Furthermore, all components of each system solutions are either developed by HY Energy or customized and optimized by supporting vendor according to HYE wind turbine special features or some specific project, this could maximize the system power production and also improves reliability and compatibility of the system. Our engineering team could provide whole system design and full construction support base on your specific requirements. We believe soon you will benefit from our professionalism.

 

2. HY-1500 wind turbine special feature - Over-speed Control System

 

This power curve generated by wind tunnel testing indicated that the blade aerodynamics braking system starts to take effect from 14-15m/s wind speed, the rotor RPM is always limited within wind turbine rated maximum RPM at even higher wind.

 

Abandoned the traditional failure-prone mechanical furling system, the blade itself is designed with over-speed braking system which will generate a reverse reluctant torque to lower the blade rotation speed so that the blades and generator can be well protected in higher wind, it solved safety and reliability problems facing by most small wind turbines.

 

Combination of Electromagnetic braking and aerodynamic braking maximizes energy capture by extending turbine’s operating speed range into higher and lower wind speed which are missed by the old style wind turbines.

 

3. Tower Installation:

An ideal location for wind generator is required with stable speed and direction of prevailing wind. Small changes in wind speed and direction can have a dramatic effect on power production. In general, the higher the tower, the greater the wind speed and ultimately power production are. Therefore, the site of your wind turbine should be carefully considered. Each installation is different and is often compromised among the tower height, distance from the battery bank, local zoning requirements and obstacles such as buildings and trees. Following requirements should be followed:

  • The minimum recommended tower height is 20 ft (6 m) on open ground or 20 ft (6 m) above nearby obstructions;
  • Try to locate the wind turbine in the “cleanest” turbulent free air as possible. Turbulence will reduce the efficiency of wind turbine and may accelerate wear on rotating components.
  • Try to locate the turbine without obstacles within 200m of installation center.
  • The installation distance between two turbines should be 8-10 times of the rotor diameter.
  • Installation site should be complied with local regulations.

 

Contact Details
Guangzhou HY Energy Technology Limited Corp.

Contact Person: Crystal Huang

Send your inquiry directly to us (0 / 3000)

Other Products
Guangzhou HY Energy Technology Limited Corp.
5th &7th Floor,Tiangui Building B Tower,No.62 Tiangui Road,Huadu District,Guangzhou,China
Tel:86-20-36888000-8010
Mobile Site Privacy Policy China Good Quality Wind Turbine Generator System Supplier. Copyright © 2017 - 2020 windturbinegeneratorsystem.com. All Rights Reserved. Developed by ECER